Tender package to supply equipment for the 22 / 110kV TBA Power Plant and the 110kV Cam Ranh TBA NXT Solar Power Plant The Central Power

Renewable Energy 1 1024x682 - Tender package to supply equipment for the 22 / 110kV TBA Power Plant and the 110kV Cam Ranh TBA NXT Solar Power Plant The Central Power

Client unit: Central Power Corporation.

Time: 2018

Supply and transport of first and second equipment, computer control systems, information systems, telecommunications, camera systems for 22 / 110kV TBA Power Plant and 110kV Cam Ranh NXT Plant

  • Supply equipment 110kV: Cutting machine, Isolating knife, Lightning protection valve
  • Supplying 24kV distribution equipment
  • Provide control cabinet protection
  • Provide AC / DC system, battery
  • Provide computer system
  • Providing telecommunication information system
  • Provide camera access control system
  • Providing fire alarm system
  • Service of transportation, installation, system configuration settings

Solar power plant Central power

  • Scale and location of the project: The Central Power Solar Power Plant with a generating capacity of about 50MW will be invested and built in Cam An Bac commune, Cam Lam district, Khanh Hoa province, including the following items:
  • Building a solar battery system with the capacity to put into the grid about 50MW (AC);
  • DC / AC converter system (Inverter);
  • System of TBA lifting 0.4 / 22kV;
  • DC, AC lines connected internally in the factory and connected to 22 / 110kV TBA;
  • Remote control and monitoring system (SCADA), weather monitoring;
  • Control house, internal road system, fence, communication, camera, lightning protection, lighting, fire protection, and some other auxiliary systems, …
  • Constructing new 110kV substation and 110kV line (about 14km long) to connect the plant to the national electricity system (the connection point at Cam Ranh 110kV substation) Meeting the power supply capacity for regional loads in the coming period to serve the local socio-economic development cause

The project has been completed with a total investment of about 20 billion Vietnam dong.